Key facts
| Length | About 29.7km, mostly elevated, including a sea link to Butterworth |
| Stations | 20 confirmed and 2 provisional (Silicon Island and Jalan Bagan Luar) |
| Ends | Silicon Island in the south; Komtar on the island and Penang Sentral on the mainland |
| Cost | About RM16.8 billion (revised figure reported in October 2026) |
| Built by | MRT Corp, after the federal government took over the project in 2024 |
| Opening | Targeted for December 2031 |
| Expected riders | About 60,000 a day by year 3, rising to about 168,000 a day after 20 years |
| Park-and-ride | About 1,800 parking bays planned |
Route and stations
The line starts on Silicon Island, the reclaimed island off the southern coast. It passes the airport and the Bayan Lepas Free Industrial Zone, runs through Bayan Baru, Bukit Jambul and Sungai Nibong, then follows the east coast past USM, Gelugor and Jelutong into George Town.
At Macallum the line splits. One branch ends at Komtar. The other crosses the channel on a 6km sea link to Penang Sentral in Butterworth, where it meets the ETS and KTM Komuter trains, the ferry and the main bus terminal. Trains will alternate between the two ends.
| Code | Station | Notes |
|---|---|---|
| A01 | Silicon Island | Provisional terminus; depot site |
| S02 | Permatang Damar Laut | Park-and-ride |
| S03 | Penang International Airport | |
| S04 | Sungai Tiram | |
| S05 | FIZ South | Bayan Lepas Free Industrial Zone |
| S06 | FIZ North | Bayan Lepas Free Industrial Zone |
| S07 | Jalan Tengah | Park-and-ride |
| S08 | SPICE | |
| S09 | Bukit Jambul | Park-and-ride |
| S10 | Sungai Nibong | |
| S11 | Sungai Dua | Interchange; park-and-ride |
| S12 | Batu Uban | |
| S13 | Jalan Universiti | Serves Universiti Sains Malaysia |
| S14 | Gelugor | Park-and-ride |
| S15 | Penang Waterfront | |
| S16 | East Jelutong | |
| S17 | Sungai Pinang | Park-and-ride |
| S18 | Bandar Sri Pinang | Park-and-ride; first station built |
| S19 | Macallum | Line splits to Komtar or Penang Sentral |
| S20 | Komtar | Island terminus |
| S30 | Jalan Bagan Luar | Provisional; on the sea link |
| S31 | Penang Sentral | Mainland terminus; ETS, KTM Komuter, ferry and buses |
Station names, codes and order follow MRT Corp's published plan and may change before opening. Provisional stations may not be built.
Timeline
- 2024: The federal government takes over the project from the Penang state government. MRT Corp becomes the developer.
- January 2025: Groundbreaking at Bandar Sri Pinang.
- 2026: Work under way at 16 sites. Bandar Sri Pinang and the airport stations are furthest along. Large-scale construction starts in the fourth quarter.
- 2027: Construction of the sea link to Penang Sentral is due to start.
- December 2031: Target opening.
Expect road works and diversions along the route until then, especially around Jalan Tengah, Sungai Nibong, Batu Uban and Komtar.
6 pros of buying near a station
- An easier commute. Bayan Lepas to George Town is one of Penang's worst daily drives. A train that skips the traffic jams is a real quality-of-life gain.
- Steady rental demand. Stations sit next to the Free Industrial Zone, the airport and USM, all big pools of tenants who would rather not drive.
- Room for price growth. Homes within walking distance of a station have historically held their value better in Klang Valley. Penang is starting from a lower base.
- One car instead of two. A household near a station may not need a second car, which frees up money for the loan each month.
- Better amenities nearby. Stations bring shops, offices and new transit-oriented developments around them, plus park-and-ride for those living further out.
- Island and mainland join up. The sea link to Penang Sentral means mainland buyers can work on the island without the bridge traffic, and island buyers can reach the ETS easily.
6 cons to weigh
- A long wait. The line is due in December 2031, and big rail projects often slip. This plan has already been redrawn several times since 2015.
- Years of construction. Living near the route until then means road closures, noise and dust.
- The premium may already be priced in. Developers advertise "near LRT" early. Check the actual walking distance to the station, not the distance in the brochure.
- Noise and privacy. The line is mostly elevated. A unit facing the track can hear trains from early morning, and passengers can see in.
- Plans can change. The two provisional stations may not be built, and station positions have moved before. Do not pay extra for a station that is not confirmed.
- Busier streets. Stations draw crowds, traffic and parking pressure, and the area around them can become much denser over time.
Rule of thumb: the benefit is strongest within about a 10-minute walk (roughly 500 to 800m) of a confirmed station, with a covered or safe walking route. Beyond that, treat the LRT as a bonus, not the reason to buy.
Frequently asked questions
When will the Penang LRT open?
The current target is December 2031.
Does the LRT go to Butterworth?
Yes. A branch from Macallum crosses the channel to Penang Sentral, where you can change to ETS and KTM Komuter trains, the ferry and buses.
Does it go to Gurney, Tanjung Tokong or Batu Ferringhi?
Not on this line. Komtar is the northern end on the island. A line to Tanjung Tokong has been proposed separately but is not part of the Mutiara Line.
Should I pay more for a home near a future station?
Only a modest premium, and only for a confirmed station within easy walking distance. Make sure the home still makes sense if the line opens later than planned.